Year 1993 :
- Hospital Building inaugurated.

Year 2001:
- CT Scan conventional installed.

Year 2002 :
- UPS and DG Set for uninterrupted power supply.

Year 2007 :
- MRI (0.3 Tesla) installed.

Year 2008 :
- Jan 2008 Colour doppler machine with multiprobes installed
- Digital X ray machine installed
- Heart lung machine installed
- 5th May 2008 Dialysis center started .
- 2D Echo / Stress test Dept. functional.
- Computerization of Admission, Billing, Accounts , Medical store HMS.

Year 2009 :
- New DSA installed in Radiology
- The New wing ground floor inaugurated for OPD & Billing.
- Well equipped new technology server room along with four IBM servers installed in rack.
- New brand Lenovo desktop with rack model server installed.
- EMG/EEG/NCV studies & PFT fully functional.

Year 2010 :
- CCTV are installed in different essential departments
- Feb. 2010 Endoscopy Dept. started.
- Computerization of attendance through facial & retina scan through Interix software, with issual of computerised RFID cards for the staff.
- The free transport facility made available for patients from Kamothe,Pargaon - Dapoli , Awade , Chinchapada for the benefit of patients.
- 25 & 26 Feb 2010 foreign delegates visited to hospital for & arrange a camp in tribal area of Rasayani with the aid of MGM Team.
- The New wing second & third floor inaugurated, speciality OPD like Medicine, Chest T.B., Ophthalmology, ENT , Psychiatry ,Skin & VD were shifted.
- A separate wing is allotted on 2nd floor New wing for superspeciality OPD’s like Cardiology, CVTS , Urology, Neurosurgery .
- MCI inspections for increased in PG seats for Medicine, Surgery, Anaesthesia, Orthopedics & DNB inspection for Neurosurgery were conducted.
- Hospital staffs were nominated to attend different workshop arranged by professioal consultancies like Cristian Medical Associartion & HOSMAC on Biomedical Engineering, NABL accreditation of laboratories & Hospital infrastructure & Planning.
- Shited Physiotherapy OPD to more spacious Musculoskeletal, Neurophysiotherapy, Cardiorespiratory Depts at one place.

Year 2011 :
- Liquid oxygen & compressed air plant inaugurated.
- Central pathology , Histopathology & Microbiology labs are shifted to New pathology wing.
- Casualty renovated with new infrastructure & furniture.
- First Executive Health check up for corporate group is successfully carried out.
- Tie up with 2 corporate & 1Old age home for emergency medical services & Health check up. 2 proposals are under process.
- Instrument & equipments for Cath lab, CSSD already received.
- MCI inspections for increased in PG seats for Medicine, Surgery, Anaesthesia, orthopaedics & DNB inspection for Neurosurgery were conducted.
- Hospital staffs was nominated to attend Spirometry workshop arranged by Indian Chest Society.’
- Arranged ‘Rangoli compition’ & ‘Haldikumkum programe’ as a staff welfare.
- Centralized A/C plant work is in final stage expected to be commisioned by April end.
- Installed Aqua Gard with Water Cooler in New wing Basement for drinking water facility to patients.
Attendant pass system started to control the rush of Patients visitors.